This booklet was designed and published by the monastery communication staff. Photographer Bill Sheets of Louisville, Kentucky, took many of the photographs. Some photos were acquired from the monastery archives.
Sin títuloChurch Renovation
8 Descripción archivística resultados para Church Renovation
Frank Ford was the contractor's superintendent of construction for the monastery church. The contractor was Realm Construction Co., Inc, Louisville, Kentucky
Sin títuloThese prayer services, held at Midday Prayer, took place on the colonnade with workers present. Includes photographs from the 2001 prayer service.
Sin títuloThe architectural firm for the church restoration was Potter and Cox Architects, Louisville, Kentucky.
Sin títuloThese blueprints are regarding the church roof. Gutters, tile removal and replacement are displayed.
Sin títuloThe St. Benedict Hall renovation took place between 1993-1995. The monastery church restoration was carried out between 2001-2005. Statistic sheet containing dates, renovated and restoration footage and costs, fundraising campaign goals and successes, Ferdinand 2011
Sin títuloThe official dedication certificate, signed by Abbot Justin Duvall, O.S.B., presider at the dedication ceremony, and Sister Kristine Anne Harpenau, O.S.B., is in this file.
Sin título