Eugene R. Hausman was chief architect for the 1993-1995 renovation of St Benedict Hall. Hausmann sent his documents on the renovation to the Sisters of St. Benedict in November 2011. See "Finding Aids."
Appraisal, destruction and scheduling
Accruals
System of arrangement
none
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
FINDING AID 2152
St. Benedict Hall Renovation
Facilities Planning Study,Pearce 9/1/1991
Turner Nikolajevich
Pearce Turner Nikolajevic Study 1979
List of bidders` 1/20/1994
Project Manual WHGK--9301 2/25/1994
Project Manual WHGK--9301 3/21/1994
Mechanical Pics--9301 11/3/1994
Pictures--1995 1995
Pictures--1992, 1993 1992, 1993
Project Manual--Power Plant,
Heating, Air Conditioning,
and Electrical Renovations-Harrell Mechanical, Inc.
Progect Manual--Chapel Walkway,
Renovatiins, Pics--9427 7/15/1995
9701 Monastery Immaculate
Conception Chapel 1992-1997
Chapel Bids 3/24/1994
Monastery Immaculate Conception
Planning, 9802 1992, 1993
Sub contractor estimates, costs (Weyer Electric, fire alarm)
Boiler cost estimates (1991)
Phase 1 Proposal-Bldg Task Force, 3 April 1993
Montgomery Engineering Corporation: Central Power Plant Study, Phase 1 Cost Estimates, 9 April 1993
Phase 1 Payment schedule 21 April 1993